We can only Imagine!!!!!

Counseling Center
Stage
Kitchen
Cafeteria
LibraryThe building is beginning to take on form and whole rooms can be seen. I have included pictures of the gymnasium/worship center/performing arts center roof line that was completed yesterday. Also included are pictures of the library, counseling center, cafeteria, kitchen, classrooms and stage. Our stage by the way is almost the same size as the stage at the Paramount Theater in Seattle.




When we think of summer we think of the "lazy-hazy" days of summer. And for the most part I think many of us try to take life down a notch and try to relax more. Children are off from school and many take vacations, the weather is warm and the pool or beach or lake are so inviting. In a time when most begin to relax a little, the activity around the ReCreation Center is "heating" up. The outside walls on the bottom floor are up. The inside walls have been formed and sheet rock/wall board is being installed. The main truss that gives the gymnasium its stability has been put into place. This is going to be an exciting summer. Watch us grow!!!!
